1 00:00:00,000 --> 00:00:02,982 Hi, I'm Jennifer Takeshita. I'm the Teledyne Brown 2 00:00:02,982 --> 00:00:06,152 manufacturing lead for the Launch Vehicle Stage Adapter. 3 00:00:06,152 --> 00:00:08,821 We're here at Marshall Space Flight Center and this is 4 00:00:08,821 --> 00:00:10,906 Rocket Science in Sixty Seconds. 5 00:00:10,906 --> 00:00:14,702 ♪♪♪♪ 6 00:00:14,702 --> 00:00:17,580 So the LVSA connects the SLS core stage to the 7 00:00:17,580 --> 00:00:20,082 Interim Cryogenic Propulsion Stage at the top. 8 00:00:20,082 --> 00:00:23,627 ♪♪♪♪ 9 00:00:23,627 --> 00:00:26,338 My team works with NASA to create four hundred thirty 10 00:00:26,338 --> 00:00:28,883 feet of defect free welding. That's the equivalent of 11 00:00:28,883 --> 00:00:30,718 one and a half football fields. 12 00:00:30,718 --> 00:00:34,430 ♪♪♪♪ 13 00:00:34,430 --> 00:00:37,892 The Launch Vehicle Stage Adapter is 27 point 6 feet in 14 00:00:37,892 --> 00:00:40,770 diameter at the bottom, sixteen point eight feet at the top 15 00:00:40,770 --> 00:00:44,106 and it's a thirty foot tall cone, approximately the size of 16 00:00:44,106 --> 00:00:45,357 a three story building. 17 00:00:45,357 --> 00:00:48,903 ♪♪♪♪ 18 00:00:48,903 --> 00:00:52,698 The LVSA connects and protects. It connects the core stage 19 00:00:52,698 --> 00:00:55,743 to the In-Space stage while protecting the the In-Space stage